Large Coal Yard / Power Plant Perforated Windbreak and Dust Suppression Project
Custom Northwest China, arid and windy mountainous region

Large Coal Yard / Power Plant Perforated Windbreak and Dust Suppression Project

A large coal yard and power plant in Northwest China installed blue perforated windbreak panels to reduce dust from open-air coal and bulk material storage.

The Challenge

Complex mountainous terrain and frequent strong winds caused severe dust pollution, material loss, and environmental pressure around the open-air storage yard.

Our Solution

A reinforced concrete base, galvanized steel trusses, and blue perforated windbreak panels were combined to weaken wind energy and reduce leeward wind speed.

Project Gallery

Large Coal Yard / Power Plant Perforated Windbreak and Dust Suppression Project Project Gallery 1

Project Facts

Material
High-quality hot-dip galvanized steel sheet
Total Area
Approx. 3,500 sq.m., total length about 1.2 km
Completion Year
2023

Specifications

MaterialHigh-quality hot-dip galvanized steel sheet
Thickness0.8-1.0 mm
FinishDouble-sided electrostatic powder coating, anti-corrosion and UV-resistant, environmental blue
PatternSingle / double-peak formed perforated windbreak panels
Open Area30%-40%
Panel SizeNet wall height approx. 6-8 m above the concrete base
Fixing SystemReinforced concrete retaining wall with high-strength galvanized steel truss support
Wind Load RatingCustomized by local maximum wind pressure and wind tunnel test calculations
Design OutcomeDust flying rate was reduced by more than 85%, improving air quality and reducing material loss.